by Vicky Priestley | Apr 30, 2020 | Blog, Hannan News
How is everyone doing six weeks into lock-down?
Team Hannan have settled into working from home and everyone is doing a brilliant job of maintaining ‘business as usual.’ With a little help from the miracle of modern technology we remain apart yet connected.
We are increasingly thankful to all the key workers, selflessly risking their safety to continue to provide essential services for us during this time and we feel very proud of how UK communities & businesses have come together to support each other and help fight the Covid-19 pandemic.
We are thankful for our strong client base and the interesting projects that are keeping us busy and we are each making the most of the additional free time we do have to reflect and take stock; learn new skills & hobbies; exercise; bake; read and catch up with friends and family.
Although maintaining a positive outlook towards the unknown territory that still faces us, we very much look forward to things gradually returning to something even vaguely resembling the ‘old normal’ and seeing people in the flesh again soon!
We think that it’s important to maintain contact with one another now more than ever, so if you fancy a virtual coffee and catch up or perhaps have a query about a project please get in touch…….
Stay safe everyone!
Business Development & Marketing Manager
by Charlotte Stansfield | Nov 18, 2019 | Blog, In Focus, Uncategorized
The third and final phase of the Slate Yard Build to Rent scheme at New Bailey Salford has reached its highest point of development at 21 storeys.
The £30M apartment block is the largest of the three residential buildings and includes 21 storeys and 199 apartments with one, two and three bedrooms. The Slate Yard provides tenants with leisure and retail facilities at ground floor level, car parking spaces and pedestrian & cycle routes to Irwell River Park.
The Hannan residential team are very pleased to be providing Building Services Engineering consultancy for the project alongside other team members AHR Architects, Buro Four, Walker Sime, WSP and main contractor Morgan Sindall.
The design of the building and the services strategy utilises energy efficient features throughout to minimise its carbon and environmental footprint and meet the sustainable standards set out in the Part L Building Regulations.
Passive construction techniques in the design of the building include enhanced insulation to limit heat loss and an engineered façade design to maximise the use of natural daylight & passive solar gains but minimise overheating.
The Incorporation of high efficiency systems and effective controls throughout the design will help to further minimise energy usage. These features include: smart heating controls, heat recovery ventilation systems, energy efficient lighting and energy efficient lifts.
Photovoltaic panels have been incorporated into the building design to meet a proportion of the electrical demand.
The Slate Yard is one of several schemes we are involved with as part of the £650m New Bailey development scheme being delivered by The English Cities Fund, a joint venture between Muse Developments, Legal and General and Homes England.
We are proud to be a part of the team delivering this important regeneration scheme which aims to create a gateway between Manchester and Salford and provide business opportunities for large and small organisations.
by Charlotte Stansfield | Aug 20, 2018 | Awards, Blog, Hannan News, Home, Uncategorized
Congratulations to our client, Muse Developments, who have been shortlisted for two awards at this year’s Insider Yorkshire Property Awards.
Muse Developments have been shortlisted for; ‘Deal of the Year’ for Premier Farnell’s move to Logic Leeds Business Park, as well as being shortlisted for ‘Developer of the Year’ at the awards ceremony being held on Thursday 20th September at New Dock Hall, Leeds.
Premier Farnell, the technology distributor, have invested in a 360,000sqft distribution unit at the business park, which will stock over 420,000 products. The unit, which is currently under construction by Bowmer and Kirkland, has been funded by Aberdeen Standard Investments and is expected to be operational by late 2019 / early 2020.
Logic Leeds Business Park consists of a 100 acre manufacturing & distribution park located within the Aire Valley Enterprise Zone. The business park provides high quality industrial & warehouse units, in a fully landscaped environment, with immediate connectivity to the M1 motorway.
Previously completed developments at Logic Leeds include; the Trilogy@Logic Development, which consists of three industrial units totalling 100,000 sqft, which have been bought by the City Council from Muse and were completed by GMI Construction in July, as well as the 50,000 sqft John Lewis customer delivery distribution hub and the 80,000 sqft Amazon distribution unit.
Hannan Associates are very proud to have worked alongside Muse Developments in delivering infrastructure masterplanning and MEP performance duties for the entire Logic Leeds Business Park scheme as well as providing Tenant Liaison duties where required.
Recent Comments