by Hannan UK | Oct 12, 2017
Bristol Sport Ashton Gate Stadium
PROJECT OVERVIEW
We were appointed by Bristol Sport together with Capita Project Management and KKA Architects for the scheme to complete the redevelopment of the Ashton Gate Stadium.
The redevelopment involves the replacement of the South Stand, West Stand and the refurbishment of the existing East Stand increasing seating capacity to circa 26,500 seats. Construction for the development has been phased to allow continued usage of the stadium for football and rugby events during the construction. The stadium is designed as a flexible use for non-event day use including exhibitions and conferences and the concourses have enhanced finishes with LED lighting and signage internally and externally.
The planning conditions included a requirement for renewable energy production and the scheme includes bio diesel heating and a large photovoltaic array on the West stand roof.
We were appointed to provide MEP Design, Acoustics, IT, Sports Lighting & Fire Engineering Consultancy and BREEAM Assessment for the project.
by Hannan UK | Jun 13, 2017
Amazon, Logic Leeds Business Park
PROJECT OVERVIEW
We provided utilities infrastructure master planning and procurement for the overall development proposals and design and monitoring services for the MEP associated with the initial speculative 80,000 ft² industrial unit. As part of the team we contributed to the specification of the unit which was developed to provide a wide tenant appeal and a high level of flexibility to attract potential tenants.
The unit is now let to Amazon and we assisted the client during the letting of the unit and carried out the design and monitoring of additional car parking facilities requesting by Amazon.
Logic Leeds is part of the Leeds Enterprise Zone, which means that it benefits from a range of incentives for occupiers. Overall there is outline planning for 1.6 million ft² of quality industrial, storage and distribution development. All buildings will have a high BREEAM rating and state-of-the-art facilities.
by Hannan UK | Jun 13, 2017
John Lewis, Logic Leeds Business Park
PROJECT OVERVIEW
The building was constructed to meet the pre let requirements of John Lewis for a new 50,000 ft² customer delivery distribution hub. The building design and handover information was carried out using BIM protocols in accordance with John Lewis requirements.
Our role involved assisting the client with tenant liaison and the development of the brief with the John Lewis team. We were responsible for the infrastructure procurement and the provision of a Stage 3+ design and performance specification for the MEP systems. We monitored the contractor design stages and construction of the works through to handover to ensure compliance with the strict tenant requirements
Logic Leeds Business Park consists of a 100 acre manufacturing & distribution park located within the Aire Valley Enterprise Zone. The business park provides high quality industrial & warehouse units, in a fully landscaped environment, with immediate connectivity to the M1 motorway.
We are very proud to have been involved with the development of the entire Business Park as well as providing Tenant Liaison duties where required.
by Hannan UK | Jun 12, 2017
City of Manchester Stadium & Athletics Arena
PROJECT OVERVIEW
The City of Manchester Stadium was built for the Commonwealth Games held in Manchester during 2002 and converted to a football stadium for Manchester city following the games.
Hannan Associates provided checking duties and advice based on the wide experience gained in the design and execution of major stadia schemes. Hannans acted for the city council throughout all phases of the scheme. From design development, to installation and commissioning both for the commonwealth games and the occupation by Manchester City Football club. Hannan’s services also including the provision of on site engineers for the duration of construction and fitting out.
The engineers provided support for the building services maintenance contractors during the games including advice on problem solving. Part of the appointment was to identify deficiencies or over design in the scheme to provide value engineering advice to the design and build team.
Hannans were part of a team which included an architect and structural engineer; we worked together to provide a strategically coordinated design services approach.
Following the successful completion of the main scheme Hannan were appointed to design the building services for the Regional Athletics Arena and the management suite.
by Hannan UK | Oct 22, 2016
PROJECT OVERVIEW
Vimto Gardens forms part of The English Cities Fund’s £650 million Salford Central regeneration scheme designed by Glenn Howells Architects, RHWL Architects and Urban Initiatives, which covers 17 hectares around the main road of Chapel Street, Salford Central Station and the Adelphi and Bexley Square Conservation Area.
Hannan Associates provided MEP Performance Duties for the 83 apartments, 14 town houses and retail units included in the Vimto Gardens development, which is named after the famous drink that was first produced close to the site.
The scheme won urban residential development of the year at the 2016 Insider Residential Property Awards.
Awards:
2016 Insider Residential property Awards – Urban Residential Development of the Year