New Bailey Car Park, Salford

New Bailey Car Park, Salford

New Bailey Car Park, Salford

PROJECT OVERVIEW

As part of English Cities Fund’s £650M Salford Central regeneration plans we provided MEP performance duties for the new 700 space multi-storey car park at New Bailey. 

New Bailey is a high value, high density corporate centre. A Premier Inn hotel and a multi-storey car park have been completed and a 125,000 sq ft office scheme, One New Bailey, is now under construction.  

It has included in numerous awards shortlists including both commercial and infrastructure nominations in the 2016 RICS Awards, and best new car park in the 2016 British Parking Awards, where it went on to win in the Architectural Achievement Award category.

 

About This Project

5

CLIENT : English Cities Fund

5

ARCHITECT : Aedas RHWL Architects

5

PROJECT VALUE : £12 million

5

CONTRACT DURATION: 2012 - 2014

Get in touch

11 + 2 =

Stockport Exchange Redevelopment

Stockport Exchange Redevelopment

Stockport Exchange Redevelopment

PROJECT OVERVIEW

Stockport Exchange is an award winning, high-quality office quarter, with attractive public realm; car parking;  a hotel and retail units next to Stockport Train Station. We have been part of Muse’s team for the development for the last 13 years.

Our duties for each phase have included:

o Building Services Engineering

o BREEAM assessment

o Utilities Infrastructure for the site

o Passive Design Analysis

o Energy and Sustainability Support

o Part L2A Compliance Report

Phase 11,000 space multi-storey car park

Phase 2 –  No.1 Stockport Exchange – a 50,000 sq ft office block; a 115 bedroom Holiday Inn Express Hotel, a new pedestrianized public space outside the train station and a new reconfigured road layout to improve station access.

Phase 3 No.2 Stockport Exchange – a 60,000 sq ft, Grade A office. Design features include photovoltaic panels, LED lighting and ultra-low water consuming fittings. The use of natural daylight and enhanced fabric minimises the building’s carbon emissions. Our analysis of the scheme included the consideration of connecting the development to Stockport’s proposed heat network.

Phase 4No. 3 Stockport Exchange  – a 64,000 sq ft Grade A office and 399-space multi-storey car park. The office building has been designed to achieve BREEAM ‘Excellent’ and an EPC A rating. Low energy features include LED lighting, high efficiency VRF heating & cooling and heat recovery ventilation. Tenant facilities include cycle racks, showers, lockers and a communal roof terrace.

Phase 5 – No. 4 Stockport Exchange – a 60,000 sq ft Grade A office with ground floor space for shops, cafes, bars or restaurants as well as a fully accessible landscaped approach to the train station which is currently at design stage.

Future phases will include an additional 185,000 sq ft of office space and up to 100 residential apartments.

All the buildings have been designed to achieve a BREEAM Excellent rating.

Muse are Stockport Council’s development partner for Stockport Exchange, which forms part of the council’s wider £1bn town centre regeneration plan for Stockport.

Other members of the project team have included: RWHL Architects, Ryder Architecture, Sheppard Robson, RPS Group, Gillespies, Buro Four, Curtins Consulting.

 

2 Stockport Exchange Complete

 

About This Project

5

CLIENT : Muse

5

ARCHITECT : Aedas RHWL Architects

5

PROJECT VALUE : £145 approximately

5

CONTRACT DURATION: 2011 - ongoing

Get in touch

3 + 6 =

One Angel Square, Manchester

One Angel Square, Manchester

One Angel Square, Manchester

PROJECT OVERVIEW

Hannans are very pleased to have been part of the team who designed the MEP Services for the 320,000 sq ft Co-operative Group Headquarters building – One Angel Square. 

Opened by the Queen on 14th November 2013, the new head office at One Angel Square Manchester was at the time officially the world’s greenest office building, with a BREEAM score of 95.16% – ‘Outstanding.’

The design of the building was driven by the Co-operative Group’s desire to create a Carbon Negative building. The sixteen storey office building was designed to achieve a BREEAM Outstanding rating, as well as an EPC ‘A’ rated near zero carbon building, with cutting edge integrated design.

The services design included 3D modelling, together with building modelling and dynamic simulation to calculate and assess the buildings energy consumption and potential EPC and DEC ratings.

The project has won numerous honors including both Design & Innovation, and Overall Project of the Year at the 2013 RICS Awards, BCO 2013 Corporate workplace of the year, Property Week 2012 Sustainability Achievement Award, and a 2013 BREEAM Award.

About This Project

5

CLIENT : The Co-Operative Group

5

ARCHITECT : 3D Reid

5

PROJECT VALUE : £100 million

5

CONTRACT DURATION: 2009 - 2013

Ian Joyce

Ian Joyce

Director

Email: [email protected]
Phone: +44(0)161 337 2200
Awards

2011

Considerate Constructors Scheme Gold Award Builder & Engineer Awards Sustainable Project of the Year

2012

Green Apple Awards Bronze Award Property Week Awards Sustainable Achievement Award World Architecture Festival Future Project Office Shortlisted

2013

BREEAM Awards Best Office Building MIPIM Awards Best Office and Business Development National RICS Awards Project of the year National RICS Awards Design & Innovation award BCO Awards Coperate Workplace of the Year Manchester Society of Architects Awards Winner

Get in touch

5 + 7 =

Wolves FC Molineux Stadium

Wolves FC Molineux Stadium

Wolves FC Molineux Stadium

PROJECT OVERVIEW

Hannan Associates were the Building Services Designers for the master planning and redevelopment of the Molineux stadium. The first phase of the project was the new North stand, starting with the master planning of redeveloping the ground in a phased manner, with due consideration of the live stadium and site wide services. These included IT, public address, HV infrastructure, turnstile monitoring, essential services, AV systems, CCTV and replacing UEFA class 4 Elite standard sports lighting temporarily and permanently. The second phase being the new East stand, with other stands to follow. Scheme development of phase 2 including enabling works and fitting out for East stand, executive boxes, lounges and banqueting hall. Including designing services to allow early occupation of terrace and lower concourse.

About This Project

5

CLIENT : Wolverhampton Wanderers FC

5

ARCHITECT : AFL Architects

5

PROJECT VALUE : £40 million

5

CONTRACT DURATION: Aug 2009 – Sep 2011

Get in touch

12 + 11 =

Whiteknights Campus, Reading

Whiteknights Campus, Reading

Whiteknights Campus, Reading

PROJECT OVERVIEW

The University of Reading enlisted our help with de-commissioning part of a 1960’s built research faculty at their Whiteknights campus. As well as designing the refurbishment of the basement, ground and first floors, duties also included a survey of the existing structure which brought about the recognition of high levels of asbestos. All works were carried out whilst retaining the existing services and infrastructure to the Bio-science lab, science museum, refectory, lower floors, roof area and all fire escapes.

About This Project

5

CLIENT : University of Reading

5

ARCHITECT : ACR

5

PROJECT VALUE : £800,000

5

CONTRACT DURATION: 2008 – 2009

Get in touch

11 + 10 =

Pin It on Pinterest