Tritax Park, Kettering
PROJECT OVERVIEW
The Hannan Industrial team are providing building services engineering consultancy for Tritax Park, Kettering.
The park has outline planning permission for 2.3 million sq ft of logistics floor space.
Unit 1 – a 501,000 sq ft cross dock logistics facility which is currently out to tender, will be built to Net Zero Carbon in Construction and is currently targeting BREEAM Excellent and EPC A rating.
Unit 2 – a 321,875 sq ft facility, completed in 2023 and is occupied by Iron Mountain.
Unit 3 – a 122,000 sq ft facility, speculatively designed.
We are very pleased to join Stephen George and Partners, Framptons, Feasibility Limited, Trinity Property Consultants, WSP UK , EPC UK on the project design team.
The site is situated directly alongside the A14 “Trans-European” freight route at Junction 9, offering occupiers prominence and excellent transport links to the national motorway and trunk road network.