Liverpool Waters, Central Park

Liverpool Waters, Central Park

Liverpool Waters, Central Park

PROJECT OVERVIEW

Located at Central Docks the 4.7 acre park will be one of the largest green spaces in the city and is an important part of this next stage at the Liverpool Waters Development.  Plans for the park include planting thousands of trees, community gardens, play areas as well as spaces for sports and recreation and support for wildlife.

Previously a derelict site, the Central Docks neighborhood will be a mixed use business and leisure district including a new cultural hub.

Hannan Associates are providing Utilities Infrastructure and Building Services Engineering support for the park including……

o Establishing plant space requirements

o Utility supply applications for park utility services

o Lighting design and CCTV coordination

o Park containment routing for power, lighting, data and water irrigation system

o Pop up power, wireless network, and interactive help points consideration

o Park Pavilion M&E proposals

Planning also includes approval for the creation of essential infrastructure which will support the delivery of thousands of new homes, commercial, retail and leisure space within the Central Docks district over the next ten years, in line with the Liverpool Waters Central Docks Neighbourhood Masterplan.

Our team mates on the project include Walker Sime, Curtins Consulting, Planit IE and Arup.

About This Project

5

CLIENT : Peel Land and Property

5

CONTRACT DURATION: 2022 - ongoing

Get in touch

12 + 5 =

Tritax Park, Kettering

Tritax Park, Kettering

Tritax Park, Kettering

PROJECT OVERVIEW

The Hannan Industrial team are providing building services engineering consultancy for Tritax Park, Kettering.

The park has outline planning permission for 2.3 million sq ft of logistics floor space.

Unit 1 – a 501,000 sq ft cross dock logistics facility which is currently out to tender, will be built to Net Zero Carbon in Construction and is currently targeting BREEAM Excellent and EPC A rating.

Unit 2 – a 321,875 sq ft facility, completed in 2023 and is occupied by Iron Mountain.

Unit 3 – a 122,000 sq ft facility, speculatively designed.

We are very pleased to join Stephen George and Partners, Framptons, Feasibility Limited, Trinity Property Consultants, WSP UK , EPC UK on the project design team.

The site is situated directly alongside the A14 “Trans-European” freight route at Junction 9, offering occupiers prominence and excellent transport links to the national motorway and trunk road network.

About This Project

5

CLIENT : Tritax Big Box

5

ARCHITECT : Stephen George and Partners

5

CONTRACT DURATION: 2021 - ongoing

Get in touch

5 + 1 =

Willohaus, Salford

Willohaus, Salford

Willohaus Peru Street, Salford

PROJECT OVERVIEW

Construction has started on Willohaus, a new build residential development that will deliver a total of 100 affordable and sustainable Passivhaus certified apartments on Peru Street in Salford. The part five, part six-storey building will comprise a mix of one- and two-bedroom homes, including a proportion of accessible apartments at ground floor.

When complete, this will be the second Passivhaus-certified residential scheme brought forward by the English Cities Fund in Salford, following the success of Greenhaus on Chapel Street, which completed in 2024.

Our duties on the project include:

o Utilities services coordination

o Technical review and development of MEP strategy options and plant space requirements to achieve Passivhaus Certification

o Provide MEP design input into the PHPP assessment

o Building Regulations Part L Compliance Assessments

o Building Regulations Part O Limiting Overheating Analysis

o Ongoing site inspections & reporting during the construction period

The primary focus for buildings designed to achieve Passivhaus standards is to employ passive design measures to drive down energy demand. Further to this, the MEP services design is optimised to reduce operational energy intensity associated with the services installed.

The result of which is to provide an enhanced and more comfortable internal environment for residents, but importantly can reduce energy bills by typically 60%, up to a possible 90%, which offers a significant benefit to the resident.

To achieve full certification; the design and construction of the buildings are independently tested and verified prior to occupation.

Hannan Associates are working alongside Chroma, Buttress Architects, Clancy Consulting, Max Fordham, Re-Form, CBRE, Atkins Realis, in conjunction with main contractor Eric Wright Construction and MEP Contractor Ameon Building Services

The project is part of the English Cities Fund’s wider £2.5bn, 252-acre Crescent Salford regeneration scheme.

The English Cities Fund is a joint venture between Muse, Legal & General and Homes England in conjunction with Salford City Council.

About This Project

5

CLIENT : The English Cities Fund

5

ARCHITECT : Buttress Architects

5

CONTRACT DURATION: 2023 - ongoing

Tom Cutt

Tom Cutt

Associate Mechanical Design Engineer

Email: [email protected]
Phone: +44(0)161 337 2200

Get in touch

1 + 14 =

LOC8 Business Park, Maidstone

LOC8 Business Park, Maidstone

LOC8 Business Park, Maidstone

PROJECT OVERVIEW

Hannan Associates are working for Clearbell Capital on the development of this new mixed-use business park, known as LOC8. This new employment area, which has the potential to create up to 1,200 new jobs will deliver a range of modern and sustainable buildings.

As a part of our role we are providing:

o Building Services Engineering

o Utilities Infrastructure

o Sustainability Consultancy including advice regarding BREEAM

Phase 1 was completed in May 2023 and includes eleven units of 5,000 sq ft to 60,000 sq ft, which have achieved a BREEAM “Very Good” rating. Occupiers include: Zehnder; Hitachi Construction; Edmundson Electrical; and AT&T.

Phase 2 of the development reached practical completion in December 2024, adding another 186,900 sq ft to the business park across 7 units. Units are pre-let to: Technical Fixings Solutions; Huws Gray; Nivek Catering Supplies; and Ocura Healthcare, with three units remaining.

Each of the units are built to BREEAM “Excellent” standard, achieving EPC A+ ratings, and have been provided with electric vehicle charge points and solar PVS.

We have been working alongside Belshaw, PRC Architects, EPCA, Lloyd Bore, Savills, Goodrich Consulting, Patrick Parsons on the design team.

About This Project

5

CLIENT : Clearbell Capital LLP

5

ARCHITECT : PRC Architects

5

CONTRACT DURATION: 2020 - ongoing

Get in touch

6 + 8 =

Radcliffe Hub

Radcliffe Hub

Radcliffe Hub

PROJECT OVERVIEW

Hannan Associates are part of the team delivering the new Civic Hub in the heart of Radcliffe town centre.

With backing from the government’s Levelling Up Fund the hub will become the new home for leisure in Radcliffe, together with a new library, learning and community spaces and enhanced support for health and wellbeing. The new Civic Hub will not use any fossil fuels and is targeting Net Zero Carbon in operation.

The scheme also includes the renovation of the Markets Chambers to host new retail, office and studio space, the refurbishment of the Market Hall basement for multi-purpose events space and improvements to the surrounding town centre public spaces.

Our team is currently providing MEP engineering consultancy duties, building physics and sustainability services.

We join Pozzoni Architecture, Alan Johnston Partnership, PlanIT, Bespoke Fire and Sutton Sustainability on Vinci Building’s design team working for Bury Council.

About This Project

5

CLIENT : Bury Council & Vinci Building

5

ARCHITECT : Pozzoni Architecture

5

PROJECT VALUE: £40M

5

CONTRACT DURATION: 2021 - ongoing

Get in touch

11 + 2 =

Pin It on Pinterest