PROJECT OVERVIEW

Hannan Associates are currently working to deliver a £100million regeneration scheme within Prestwich Town Centre. The scheme is being brought forward via a joint venture partnership formed between Muse & Bury Council.

Proposed works for the first phase of Prestwich Village include:

o A Community hub building with a library and community space

o Retail and leisure spaces

o New market hall

o Village square.

o Multi-storey mobility hub including 20% EVC provision

 

Our role includes the following:

o Assessing works associated with existing utilities networks to accommodate the new development proposals.

o Consultation regarding new utility supply requirements.

o Providing MEP design duties for each plot and the associated public realm.

o Assessing the anticipated building performance using operational energy modelling techniques.

o Undertaking the BREEAM assessments for the relevant plots.

Each of the plots have been designed to reduce operational energy and carbon emissions, employing a fossil fuel free all-electric strategy.

Passive measures have been prioritised to reduce energy demand, including enhanced fabric performance and air permeability, along with optimised glazing design.

Active measures have been taken to optimise the energy efficiency of fixed base build systems, i.e. Mechanical ventilation incorporating heat recovery, low flow sanitaryware, energy efficient LED lighting and controls systems.

Low & Zero Carbon Technologies have been incorporated where applicable in the form of high efficiency heat pumps to generate space heating, and allocation of dedicated zones at roof level for installation of a PV array.

Each of the schemes have been designed to achieve a minimum of BREEAM ‘Excellent’ rating.

Proposed works for the second phase of the scheme includes 200 new homes, a mix of apartments and townhouses.

We are working alongside Jon Mathews Architects; Chroma Consulting; Planit, Civic Engineers; MAC Construction Consultants; Hoare Lea; Design Fire Consultants, & Asteer Planning on the design team.

About This Project

5

CLIENT : Muse & Bury Council

5

ARCHITECT : Jon Matthews Architects

5

PROJECT VALUE: £100M+

5

CONTRACT DURATION: 2023 - ongoing