DWP Hub,
Talbot Gateway Blackpool

PROJECT OVERVIEW

Plans for this new 215,000 sq ft, £100m office development will form part of the third phase of the Talbot Gateway regeneration scheme in Blackpool, led by Muse.

When complete the seven storey office building will become home to over 3000 staff from the Department of Work and Pensions.

Hannan Associate’s duties have included:

  • Energy & Sustainability Statement
  • Net Zero Carbon in Operation Assessment incl. Operational Energy Modelling
  • BREEAM Assessor duties
  • Building Services Engineering Consultancy

The building has been designed to be ultra-low energy. Low-carbon heating and cooling to the office will be provided via air source heat pumps. Demand-driven ventilation will also be provided, helping improve indoor air quality while saving energy during periods of reduced occupancy.

The building has been designed to achieve a BREEAM ‘Excellent’ rating.
We are working alongside Make Architects, RPS, Chroma, Arup on Muse’s design team.

The Talbot Gateway regeneration is transforming Blackpool town centre and will comprise of a new business district and civic quarter, grade A offices, retail space, event space and a new public transport interchange.

About This Project

5

CLIENT : Muse

5

ARCHITECT : Make Architects

5

CONTRACT DURATION: 2020 - ongoing

Get in touch

3 + 3 =

Pin It on Pinterest

Share This